久久久久久久免费视频|狠狠久久综合色惰88|天天中文字幕av天天爽|久久水玲珑亚洲国产精品|亚洲天堂一区二区三区四区|欧美91精品久久久影视网|亚洲国产精品一区二区美利坚|精品无码AV少妇一区二区三区

Welcome to GuangYuan · GuangZhiYuan Technology! Contact number: 0769-22780950
中文  |  English  |  Online message  |  Contact us
Advanced Search:


Consultation hotline

0769-22780950


Tell:0769-22780950

Fax:0769-22780951

E-MAILgybp@263.net

Add:No. 2, Xiheng 2nd Road, Bajiaowo Industrial Zone, Wanjiang 
District, Dongguan City, Guangdong Province,China.





Entreprises news

GuangYuan · GuangZhiYuan sensing heating equipment operation sequence

Source: Time:2021-06-29 09:51:37 views:

1. Check if the installation of the equipment is all completed. 2, the machine should open the side door inside the side inspection machine due to long-term transportation, there is no obvious looseness of the various plugs, plug-in screws, etc., if you have the company's live service personnel, or by the customer's professional electrician. 3, first water, wait for each waterway to flow out, and the water pressure is stable after delivery. 4, adjust the sensor and put the workpiece.
1. Check if the installation of the equipment is all completed.
2, the machine should open the side door inside the side inspection machine due to long-term transportation, there is no obvious looseness of the various plugs, plug-in screws, etc., if you have the company's live service personnel, or by the customer's professional electrician.
3, first water, wait for each waterway to flow out, and the water pressure is stable after delivery.
4, adjust the sensor and put the workpiece.
5, after the above operation is completed, turn on the power switch, and adjust the power adjustment knob to the smallest, then press the "Start" button, the device should work normally, after work, the buzzer issues an intermittent beep of about 1 second The work indicator is flashed accordingly, that is, the machine has been working properly, and can adjust the "power adjustment" knob to the desired power by workpiece heating, until the maximum.
6. Press the "Stop" button to stop working.
7, shutdown order: press the "Stop" button - Rotate the "Power Adjustment" knob to the minimum - Remove the workpiece - turn off the panel power switch - pull down the power shutdown - After 5 minutes of water, turn off the cooling Water pump power supply. (The air switch on the back side of this equipment is the capacity of the device in accordance with the limit flow, in order to extend the service life, minus the number of switches should be minimized. Please cooperate.)
8. Automatic control type method: Decompose the single heating function of the original device into three time periods of heating, holding, cooling the original device with a digital automatic control circuit. The user needs to be free from 1-99 (0.1-9.9) seconds within each period, and the heating power adjustment device on the panel is set according to the work. It is set to a reasonable heating temperature and insulation temperature to make your product processing technology. More scientifically, accurate.
9. Operational precautions:
9.1 In the automatic working state, each time counter time setting cannot be 00, otherwise, the device cannot automatically loop.
9.2 In the automatic state, the device will be done in the next time in the work, in the automatic state.
9.3 When the manual is manually, the device operates like a normal device, and the time of the panel display will not work.